Summary of works: Replace floor structure, sleeper wall repair, skirting, wood fibre underfloor insulation, airtightness membrane, reinstate pine floorboards, understairs storage, meter cabinets
This floor was in very poor condition, largely due to the void being almost completely full of rubble. All rubble was removed for clear airflow, and the subfloor ventilation upgraded. A breather membrane was installed to eliminate wind-washing (thermal bypass), fully sealed and airtight. Followed by flexible wood fibre insulation, then a vapour control layer.
The original planks were stored and reused, supplemented by reclaimed pine from other sources. Sanded and lacquered by Eden Hardwood Flooring. We then installed new skirting boards, an understairs storage area and a tricky angled meter cabinet.